SCOPE OF WORK EXCAVATION SHORING KINGSWAY PROJECT 11 GENERAL A WORK The term Workincludes all labor, materials, equipment and services required of the CONTRACTOR, as shown, described or inferred in the Contract Documents The CONTRACTOR is only to use its own forces and or OWNER CONSTRUCTION MANAGER approved subtrades to undertake the Work

Whatever your requirements, you 'll find the perfect service-oriented solution to match your specific needs with our help.We are here for your questions anytime 24/7, welcome your consultation.

Chat Online

Relate Products

News List

  • 02220 Excavation Backfill And Fill For Structures

    101 SCOPE OF WORK: A The work included under this Section consists of furnishing material and equipment, and performin g al l labor nec ess ary for excav ati ng, bac kf illing, filling and pa cti on of area s to be occupied by facilities or utility systems to be constructed

    Oline Chat
  • 312333 Trench Excavation And Backfill Rev 62305 Du

    Payment: No separate payment will be made for rock excavation 7 The cost of such work, and all cost incidental thereto, shall be included in the unit prices bid for water mains G Excavation for Vaults or Manholes: Excavate to a minimum of 12inches below the planned elevation of the base of the vault or manhole

    Oline Chat
  • 6 Removal By Dredging And Excavation ITRC

    61 Removal by Dredging and Excavation Background Information Dredging of harbors and rivers for navigational purposes has been practiced for centuries and studied extensively By parison, environmental dredging dredging for the sole purpose of removing contaminated sediment is a relatively new development

    Oline Chat
  • A Guide To OSHA Excavations Standard Duke Universi

    excavation is deep; however, when front end loaders are used to dig the excavations, the soil surcharge load must be placed as far back from the edge of the excavation as possible, but never closer than 2 feet 061 meters Work crews in the excavation are the minimum number needed to perform the work

    Oline Chat
  • ATTACHMENT 1 SCOPE OF WORK CONSTRUCTION OF REINFOR

    he Contractor shall dispose of excavated material B NEW WORK 1 The Contractor shall construct a reinforced concrete slab of 670 meters 22 feet long by 304 meters 10 feet wide by 015 meter 6 inches thick with reinforcement of 5 8steel bars @ 030 meters in both directions

    Oline Chat
  • ATTACHMENT AA DETAILED SCOPE OF WORK DEMOLITION AN

    Attachment AADetailed Scope of Work Demolition and Removal ITBDOT12 134006LH 10 A building cutoff shall be priced based on section 10 of this Attachment The unit amounts shall be determined by the square footage of the portion of the building to be demolished and removed during the cutoff process

    Oline Chat
  • City Of Coquitlam REQUEST FOR PROPOSALS

    Excavated and Contaminated Soils The scope of work generally consists of the provision of all labour and equipment for loading, hauling, record keeping, supervision and disposal of various excavated materials and wet fill material from the City of Coquitlams Service Centre Spoils Site, located at 500 Mariner Way, Coquitlam, BC

    Oline Chat
  • Civil Construction Ckyinc

    he excavated material below elevation 5 foot NGVD was within the daily tidal range of the Napa River and required special care and methods of excavation A portion of the excavated material was old fill and contained construction debris that was screened and separated out Final excavated grades were seeded with native grass seed

    Oline Chat
  • CONTAMINATED SOIL REMEDIATION GLEI

    he scope of work included clearing and grubbing, removal of site debris, construction of a lined stockpile screening area, excavation, screening and offsite disposal of waste soil, removal and replacement of existing site utilities, backfilling with onsite and imported soil fill, placement of a clay cap, and site restoration

    Oline Chat
  • Detailed Construction Scope Of Work Template Free

    Attachment 3 Detailed Scope of Work Construction of the New Franklin Park Storage Building Page 1 of 13 General Contractor GC or the SubContractor as designated by the GC is Responsible to: 1 Locate all underground utilities and their depth and location prior to start of work All private utilities

    Oline Chat
  • EARTHWORK AND SITE WORK Nidwater

    his section covers earthwork and site work Trench excavation, backfill and trench surface restoration, as well as clearing and grubbing, are covered elsewhere in these specifications 18102 Description of Work Work under this section shall include, but not be limited to, demolition, site grading, structure

    Oline Chat
  • Estimating Final Exam Flashcards Quizlet

    easuring sitework and excavation work is the same as measuring most other work of a construction project False Before the estimator can measure the site work, he or she has to make an assessment of excavation requirements from data in the specifications and drawings and from information gathered on visits to the site

    Oline Chat
  • ETHOD OF STATEMENT FOR SITE PREPARATION EXCAVATION

    he scope of this method of statement is outline the methodology of earthwork excavation and backfilling generally QCS section 6 12 will be followed unless specifically amended by the project specification and noted here under 21 QCS section 6 12 earthworks

    Oline Chat
  • Excavation And Backfilling Of Soil Work Sequence A

    Scope of Work for Excavation and Backfilling of Soil Setting out of corner benchmarks Survey for ground levels Survey for top levels Excavation to approved depth Dressing of loose soil Making up to cut off level Constructing dewatering wells and interconnecting trenches

    Oline Chat
  • Excavation In Construction From Construction Knowl

    he scope of the excavation job varies from digging footings for a small building to moving millions of cubic yards of earth The one thing all excavation jobs have in mon, though, is that careful planning is the key to success

    Oline Chat
  • EXCAVATION WORK Safe Work Australia

    Excavation work generally means work involving the removal of soil or rock from a site to form an open face, hole or cavity using tools, machinery or explosives A person conducting a business or undertaking must manage risks associated with all kinds

    Oline Chat
  • REMEDIATION WORK PLAN INgov

    Remediation Work Plan Revision 2 2 UST pit will be excavated Excavation will continue onsite where they exceed the IDCL Excavation of soils will continue to the south on the Alben Motel property Soil excavation on the Alben Motel site will continue until soils exceeding the residential

    Oline Chat
  • Scope Of Work Crushing And Screening Equipment

    Scope of work provisions for operating engineer cranes, pile driverShops, field survey work, asphalt screening, soil, cement and crushing plants for all excavation and work related to the excavation, without limiting the scopeObjectives and scope on priy and secondary crushing using jaw

    Oline Chat
  • SCOPE OF WORK EXCAVATION SHORING KINGSWAY PROJECT

    SCOPE OF WORK EXCAVATION SHORING KINGSWAY PROJECT 11 GENERAL A WORK The term Workincludes all labor, materials, equipment and services required of the CONTRACTOR, as shown, described or inferred in the Contract Documents The CONTRACTOR is only to use its own forces and or OWNER CONSTRUCTION MANAGER approved subtrades to undertake the Work

    Oline Chat
  • SCOPE OF WORK State

    1 Work area shall be cleaned of all debris at the end of each workday 2 The contractor shall provide materials safety equipment and all required tools and equipment to plete the project 3 The contractor shall provide work schedule showing starting and pletion of the project and the date and time planning to work in the residence yard 4

    Oline Chat
  • SECTION 02115 SOIL HANDLING AND DISPOSAL PART 1 GE

    SECTION 02115 SOIL HANDLING AND DISPOSAL PART 1 GENERAL 101 SCOPE OF WORK A This Section provides procedures and requirements for handling soils excavated during construction activities and includes furnishing all labor, equipment, materials, transportation, and incidentals for performing the following work, to the

    Oline Chat
  • SECTION 02220 EARTHWORK Chattanooga

    excavating all classes of material encountered, pumping, draining and handling of water encountered in the excavations, handling, storage, transportation, and disposal of all excavated and unsuitable material, construction of fills and embankments, backfilling around structures and pipe, backfilling all trenches

    Oline Chat
  • SECTION 2 EARTHWORKS Procurement Notices

    as required; the handling, storage, transportation and disposal of all excavated material; all necessary sheeting, shoring and protection work; preparation of subgrades; pumping and dewatering as necessary or required; protection of aacent property; backfilling; pipe embedment;

    Oline Chat
  • STANDARD CONSTRUCTION SPECIFICATIONS FOR EARTHWORK

    aterial placed in an excavated area B Bedding Ground or support in which pipe is laid C Borrow Material used as fill and or backfill which is obtained from a source other than required excavation D Compaction Tamping by hand or machine to achieve required density in soils E Disposal Site

    Oline Chat
  • STATE OF WASHINGTON DEPARTMENT OF LABOR AND INDUST

    bulldozing of material excavated from a public work site at various disposal sites Based on my review of the facts of this case and an analysis of applicable law, it is my determination that the bulldozing of material excavated from a public work site at various disposal sites as was done in this case is subject to prevailing wage requirements

    Oline Chat
  • Work Procedure Of Excavation At Construction Site

    Work procedure for excavation at construction site involves understanding of centre line and excavation drawings, setting out of plan on ground, excavation of soil and removal of excess soil Quality checks such as recording ground level and marking of reference points should be done